An ABC-based selling price
Corvel Ltd uses activity based costing. Its overheads for the year are:
| Cost pool | Amount | Cost driver | Total driver volume |
|---|---|---|---|
| Machine set-ups | 60 000 | Number of set-ups | 300 |
| Purchase ordering | 45 000 | Number of orders | 900 |
| Machine running | 150 000 | Machine hours | 30 000 |
Product K: 2 500 units are made; direct costs are $16 per unit; it needs 50 set-ups, 150 purchase orders and 1.6 machine hours per unit.
Corvel Ltd sets prices at full cost plus a mark-up of 25%.
What is the selling price of one unit of Product K?
A $34.75
B $37.00
C $38.75
D $41.33
[1]
- 1
Driver rates and K's overhead. Set-ups 60 000 ÷ 300 = $200; orders 45 000 ÷ 900 = $50; machine running 150 000 ÷ 30 000 = $5 per machine hour. K: (50 × 200) + (150 × 50) + (2 500 × 1.6 × 5) = 10 000 + 7 500 + 20 000 = $37 500, which is 37 500 ÷ 2 500 = $15 per unit.
- 2
Price. Full cost = 16 + 15 = $31. Price = 31 × 1.25 = $38.75. Answer C (1).
- 3
Why the others fail. A (16 + 15 × 1.25) puts the mark-up on the overhead only, not on the full cost. B uses a single plant-wide rate of 255 000 ÷ 30 000 = $8.50 per machine hour, giving overhead of $13.60 and a price of 29.60 × 1.25: that is absorption costing, not ABC. D (31 ÷ 0.75) treats 25% as a margin on the selling price instead of a mark-up on cost.
Answer
C
Examiner tip
Examiner tip: build K's overhead pool by pool from its own driver usage, divide by K's units, then add the direct costs before applying the mark-up. A mark-up is a percentage of cost; a margin is a percentage of selling price.
Common mistake: choosing B. Charging all overhead by machine hours ignores that K needs a sixth of the set-ups and orders, so it under-costs a product that is made in many small batches.