Overhead per unit from two cost pools
Kestrel Ltd makes several products, 12 000 units in total each year. It uses activity based costing for two overhead cost pools.
| Cost pool | Cost | Cost driver | Total driver quantity |
|---|---|---|---|
| Machine set-ups | 48 000 | Number of set-ups | 120 |
| Purchasing | 36 000 | Number of purchase orders | 400 |
Product X uses 30 set-ups and 100 purchase orders. 2 500 units of Product X are made.
What is the overhead per unit of Product X under activity based costing?
A $4.80
B $7.00
C $8.40
D $33.60
[1]
- 1
Cost driver rates. Set-ups 48 000 ÷ 120 = $400 per set-up. Purchasing 36 000 ÷ 400 = $90 per purchase order.
- 2
Overhead charged to Product X and per unit. (30 × 400) + (100 × 90) = 12 000 + 9 000 = $21 000. 21 000 ÷ 2 500 = $8.40 per unit. Answer C (1).
- 3
Why the others fail. A (12 000 ÷ 2 500) charges only the set-up pool and forgets purchasing. B (84 000 ÷ 12 000) spreads all the overhead equally over every unit made — a single volume-based rate, not ABC. D (84 000 ÷ 2 500) charges the whole of both pools to Product X.
Answer
C
Examiner tip
Examiner tip: work in the same order every time: rate for each pool, then the product's usage × rate for each pool, then add, then divide by the product's own units.
Common mistake: dividing by the total units of all products. The overhead charged to Product X is divided only by the units of Product X.