Rope at an angle: speed, work done and power
A crate is pulled across a rough horizontal floor by a rope inclined at an angle above the horizontal, where . The tension in the rope is N and the crate moves at constant speed, travelling m in s.
(a) Find the speed of the crate.
(b) Find the work done by the tension in the rope.
(c) Find the power of the tension in the rope.
(d) Write down the work done against friction, giving a reason for your answer.
- 1
(a) The speed is constant, so distance ÷ time gives it directly.
- 2
From (a 3–4–5 triangle), and . Use the exact ratio rather than a rounded angle.
- 3
(b) Only the component of the force along the displacement does work, so . The vertical component does no work because the crate does not move vertically.
- 4
(c) Power of a force is (component of the force in the direction of motion) × speed. Equivalently, work ÷ time .
- 5
(d) The speed is constant, so there is no change in kinetic energy and no change in height. All the work done by the tension is done against friction.
Answer
(a) (b) J (c) W (d) J, since the kinetic energy does not change
Examiner tip
The power of an angled force is , not : here W scores nothing. The same slip in (b) ( J) loses the mark for the work done.