Job, batch or flow?
Meridian Furniture (MF)
Meridian Furniture (MF) makes bespoke wooden furniture. Each piece is designed with the customer and built by one craftsperson from start to finish — job production.
MF employs 18 craftspeople and completed 240 pieces last year at an average price of $1 850.
Demand has risen 60% in a year. MF's order backlog is now 14 weeks, and the sales manager says customers are cancelling rather than waiting.
MF has found that six designs account for 68% of all orders.
Moving those six designs to batch production would need $180 000 of machinery and would roughly double output per worker on those designs.
A consultant has suggested flow production, which would need $900 000 and only pays for itself at very high volumes.
MF's founder says: "People pay $1 850 because it is made for them, not made for stock."
Explain two advantages and two disadvantages to MF of using job production.
- Advantage 1:
- Advantage 2:
- Disadvantage 1:
- Disadvantage 2:
4 marks for the points themselves, 4 marks for explaining each one in the context of MF. Half the marks are application.
Consider the advantages and disadvantages of the following three options for MF. Which should MF choose? Justify your answer.
- •Keep job production and hire more craftspeople
- •Move the six most popular designs to batch production
- •Move to flow production
Mark scheme and model answers
Part (a) — 8 marks
Acceptable points — you need 4
- Application:
Each item can be made exactly to the customer's requirements
MF designs every piece with the customer, which is why they pay $1 850
- Application:
A high price can be charged for individual work
MF's average price of $1 850 is far above mass-produced furniture
- Application:
Workers are skilled and motivated by completing a whole item
each of MF's 18 craftspeople builds a piece from start to finish
- Application:
Output per worker is low
MF's 18 craftspeople produced only 240 pieces, about 13 each a year
- Application:
Unit costs are high because there is no repetition
MF cannot spread setup work across identical pieces, even for its six most popular designs
- Application:
It is slow, so lead times are long
MF's backlog has reached 14 weeks and customers are cancelling
Full-mark answer
Advantage 1: Each item is made exactly to the customer's requirements (1). MF designs every piece with the customer, and its founder says that is precisely why they pay $1 850 (1 app).
Advantage 2: Skilled workers are motivated by completing a whole item (1). Each of MF's 18 craftspeople builds a piece from start to finish rather than repeating one task (1 app).
Disadvantage 1: Output per worker is low (1). MF's 18 craftspeople completed only 240 pieces last year, about 13 each (1 app).
Disadvantage 2: Lead times are long (1). MF's backlog has reached 14 weeks and the sales manager says customers are cancelling rather than waiting (1 app).
Part (b) — 12 marks
| Level | Marks | What it needs |
|---|---|---|
| 3 | 9-12 | Sound application of knowledge and understanding of relevant business concepts using appropriate terminology. Detailed discussion of two or more options. Well-justified recommendation. Candidates discussing all three options, in context, with a well-justified recommendation that includes why the alternatives were rejected, should be rewarded with the top marks in the band. |
| 2 | 5-8 | Sound application of knowledge and understanding of relevant business concepts using appropriate terminology. Detailed discussion of at least one option. Judgement with some justification / some evaluation of the choice made. |
| 1 | 1-4 | Limited application of knowledge and understanding of relevant business concepts. Limited ability to discuss the options, with little or no explanation. Simple judgement with limited justification. |
Keep job production and hire more craftspeople
For
Protects the made-to-order selling point behind the $1 850 price
No machinery investment needed
Keeps the skilled, motivated workforce the founder values
Against
Skilled craftspeople are slow to recruit and train, so the 14-week backlog persists
Output per worker stays at about 13 pieces a year
Wage costs rise in proportion to output, so unit costs do not fall
Customers are cancelling now, not in a year
Move the six most popular designs to batch production
For
Those six designs are 68% of orders, so most of the backlog is addressed
Roughly doubles output per worker on those designs
$180 000 is a fifth of the cost of flow production
The remaining 32% can still be made to order, protecting the bespoke claim
Against
$180 000 is still a large investment for MF
Batch-made pieces are no longer strictly bespoke
Craftspeople may resent more repetitive work
Requires holding stock, which ties up cash
Move to flow production
For
Highest output and lowest unit cost at volume
Would eliminate the backlog entirely
Against
$900 000 — five times the batch option — and it only pays at very high volumes
MF makes 240 pieces a year, nowhere near flow volumes
Completely destroys the made-to-order position that supports $1 850
The workforce of skilled craftspeople would be largely redundant
Model recommendation
MF should move its six most popular designs to batch production and keep job production for the rest.
Those six designs are 68% of orders, so batching them attacks most of the 14-week backlog that is currently losing MF customers. Doubling output per worker on that 68% would lift capacity far faster than recruiting scarce craftspeople, and $180 000 is a fifth of what flow production would cost.
Crucially it keeps the founder's point intact: the remaining 32% of orders are still made to order, so MF can still describe itself as a bespoke maker and defend the $1 850 price.
I rejected hiring more craftspeople because it is too slow. Skilled workers take time to find and train, while customers are cancelling now, and output per worker would stay at about 13 pieces a year.
I rejected flow production outright. MF makes 240 pieces a year — the consultant's own condition, very high volumes, is not met — and spending $900 000 to destroy the made-to-order position that justifies the price would be self-defeating.
This depends on MF managing the message. If customers discover that popular designs are now made for stock, the bespoke claim weakens, so MF should market those six as a standard range at a lower price and keep true bespoke as a premium tier.
Did you use the case?
Application marks are given for referring to MF specifically. Check your answer against the details you could have quoted.
- •
18 craftspeople completed 240 pieces last year — about 13.3 pieces each
- •
average price $1 850
- •
demand has risen 60% in a year
- •
the order backlog is 14 weeks and customers are cancelling
- •
six designs account for 68% of all orders
- •
batch production needs $180 000 and would roughly double output per worker on those designs
- •
flow production needs $900 000 and only pays at very high volumes
- •
customers pay $1 850 because pieces are made to order
Examiner tip
Production method should follow the product and the volume, not the other way round. The 68% figure is the key to this case: batching the popular designs fixes most of the problem while leaving the bespoke claim intact. Note that job, batch and flow are not mutually exclusive — a firm can run more than one method, and saying so is good evaluation.